Xiaj Malaysia to release report on missing flight MH370 on July 30
PESHAWAR:Skin infections were prevalent in Peshawar in 2013 as nearly 19,497 patients reported skin problems 鈥?the highest number in Khyber-Pakhtunkhwa (K-P) 鈥?according to a health depart <a href=https://www.adidascampus.com.de>campus adidas schuhe</a> ment report. The report carried data from January till December 2013.Over 140,000 people across K-P suffered different types of skin diseases caused by a number of reasons, including poor hygiene, pollution, overcro <a href=https://www.adidascampus.com.de>adidas campus 80s</a> wding due to influx of Afghan refugees and internally displaced persons (IDPs), and lack of awareness about diseases.The reports states in the past year 19,497 patients were recorded in Peshawar, 13, <a href=https://www.dunks.fr>dunk high</a> 546 in Mardan, 5,823 in Nowshera, 8,466 in Swabi, 10,669 in Charsadda, 3,133 in Shangla, 4,585 in Upper Dir, 9,946 in Swat, 4,845 in Malakand, 3,518 in Lower Dir, 3,785 in Chitral, 3,779 in Buner, 658 in Hangu, 2,960 in Kohat, 3,983 in Karak, 3,660 in Battagram, 7,942 in Mansehra, 1,109 in Kohistan, 7,852 in Haripur, 3,912 in Abbottabad, 941 in Tank, 1,991 in Lakki Marwat, 6,043 in DI Khan and 7 ISLAMABAD:The unavailability of electricity is having a devastating impact on the engineering industry rsquo;s ability to meet production targets, with a staggering 83 per cent of companies that took part in a survey raising the issue.The Pakistan Institute of Development Economics (PIDE) on Sunday released a report on the challenges fa <a href=https://www.airmaxplus.de>nike air max97</a> ced by engineering firms and provides insights into the state of the industry. The research team was led by Dr Nade <a href=https://www.nbbalance.it>new balance donna</a> emul Haque and included <a href=https://www.nbbalance.es>newbalance 550</a> Dr Usman Qadir, Dr Abid Rehman, and Mohammad Armughan, according to PIDE press release.The report is based on a survey of 328 engineering firms from across Lahore, Gujrat, and Gujranwala ndash; with the area often referred to as the lsquo;golden triangle rsquo; of engineering firms. The report reveals statistics that underscore the critical concerns affecting the industry 39;s growth and productivity.One of the foremost issues outlined in the report is the severe impact of electricity unavailability on daily produc